The works for these two projects entailed the same scope and comprise fire safety remedial works to live apartments, including replacement of existing combustible external wall systems, balcony decking, defective/missing cavity barriers, and associated build-up, support systems and accessories. The works are to be carried out to achieve a “medium/tolerable” risk as part of a PAS9980:2022 assessment, and to enable a fire engineer to confirm that the project does not present an unacceptable risk to life, as part of a Fire Safety Assessment, as required by DLUHC’s Developer Remediation Contract. The works should also, as a result, allow for the building to be assessed as “B1” on the RICS EWS1 form.
Project Type: Cladding Remediation
Sector: Residential
Location: Bristol
Value: £14m combined
Completion: Autumn 2025
Client: Crest Nicholson
Project Manager: Airey Miller
Quantity Surveyor: Airey Miller
Architect: GCP
Structural Engineer: Craddys
Fire Engineer: Marshall Fire
OFFICES
London Office
41 – 43 Saffron Hill
Farringdon
London EC1N 8FH
+44 20 7100 7020
Bristol Office
The Quorum
Bond Street
Bristol BS1 3AE
+44 11 74 054 333
Bedford Office
Stewart House
69-71 Bromham Rd
Bedford MK40 2AQ