Pall Mall
![Pall Mall 02 Pall Mall 02](https://redconstruction.b-cdn.net/wp-content/uploads/elementor/thumbs/Pall-Mall-02-qc06xudf0atim9a291p5ar6i2okxrr6rtk3jt8g03g.jpg)
Contract: JCT Design and Build
Sector: Commercial
Location: Westminster, London
Client: PKS Immoblin GmbH & Co
Architect: ORMS
Quantity Surveyor: Exigere
Development Manager: Simten Developments
Project Manager: Gardiner & Theobald
![](https://redconstruction.b-cdn.net/wp-content/uploads/2023/09/Pall-Mall-08-768x439.jpg)
DESCRIPTION
Our dedicated London team will oversee the creation of a new office development, comprising of basement, ground, and seven storeys, with terraces at fifth, sixth and seventh-floor levels. The existing foundations and basement will be reused to reduce embodied carbon, while the new construction uses Cross Laminated Timber (CLT) floor slabs, evidence of a clear focus on sustainable materials throughout. The development will call on our team’s experience in the retention and restoration of heritage features, as we reinstate the building’s impressive façade.