Following significant fire and water damage at Bromley Court, our team undertook a full programme of remediation and reinstatement works. The scope of phase 1 began with the removal of all damaged elements, including loose fixtures and fittings, ceilings, walls, floors, doors, bathrooms, en-suites, and kitchens.
Mould remediation was carried out to ensure the building was safe and compliant. After treatment, we reinstated all affected walls, floors, and ceilings, and installed new kitchens, bathrooms, and en-suites throughout. Damaged front entrance doors and riser doors on multiple levels were replaced.
Final works included mage good decorations as well as comprehensive testing and commissioning of all electrical and mechanical systems within the apartments.
Phase 2 consisted of external works including terraces, balcony & façade repairs.
Project Type: Cladding Remediation
Sector: Residential
Location: Bromley South London
Value: £6million
Completion: Autumn 2025
Client: Landsec U&I
Project Manager: Avison Young
Quantity Surveyor: TTA
Architect: Ryder
Services Engineer: Hoare Lea
OFFICES
London Office
41 – 43 Saffron Hill
Farringdon
London EC1N 8FH
+44 20 7100 7020
Bristol Office
The Quorum
Bond Street
Bristol BS1 3AE
+44 11 74 054 333
Bedford Office
Stewart House
69-71 Bromham Rd
Bedford MK40 2AQ