80 New Bond Street

80 New Bond Street
80 New Bond Street

Contract: JCT Design and Build
Project Type: Commercial, Retail
Location: London West End, UK
Completion: August 2023
Size: 32,500 sq ft

Client: Hines
Architect: ORMS
PQS: Gardiner & Theobald
Structural Engineers: Price & Myers
MEP Engineers: SWECO
Project Manager: M3 Consulting

DESCRIPTION

Our London team developed 37,414 sq ft of existing office and retail space with dual frontage to both 80 New Bond Street and 325 Oxford Street. Targeting WELL Platinum and Wired & Smart  Score Platinum, with a BIM Level 2, 80 New Bond Street’s structural alterations featured a complete renovation of internal steelwork, with an innovative pre-cast concrete lift core, glass-reinforced concrete façade panels, and pre-cast feature columns inserted between the ground and first floor.

The team carried out the part demolition and removal of the existing lift core structure, with three additional floors added to the building, totalling eight floors to a Category A fit-out, with two retail units created on the ground and first floors, spanning 6,000 sq ft. The scheme has created a total office area of 31,000 sq ft, with floorplates ranging from 3,000 to 6,500 sq ft, and a large communal roof terrace. The office entrance has been repositioned onto Dering Street, incorporating a dedicated, spacious reception area. 

80 New Bond Street