A key milestone reached at 45 Nightingale Lane, Clapham.
Following pre-pour checks – the concrete slab works commence to Block B – 45 Nightingale Lane.
Edging closer to “crane erection day” the crane base reinforcement is inspected for pre-pour sign-off
Circa 50m3 of C50 concrete providing around 100 tonnes of anchor to the Raptor 48 crane.